Project Location: Becker, MN Office
Owner: Xcel Energy
Contractor: Boldt Construction
Formed and poured refractory pier dam (94.5’ long x 2.5’ high, x 25” thick) and skim coated the penthouse roof tubes and poured the penthouse penetration boxes.
Material Used: Lougun 26 LI, US 60 LC, WB Anchors, SS Needles, 2” Block insulation.