Project Location: Maysville, KY Office
Owner: East Kentucky Power Cooperative
Contractor: Alstom / APComPower, Inc.
APi supplied and installed approximately 245,000 SF of insulation and lagging on a 300-MW Alstom CFB boiler, Alstom flash dryer absorber (FDA), Alstom fabric filter dust collector, air heater, fans, and the associated ductwork. In addition, APi installed over 12,000 LF of boiler piping.