Project Location: Homer City, PA Office
Owner: General Electric
Contractor: Kiewit Power Constructors
Supply and installation of nearly 600,000 SF of insulation and lagging on two (2) Alstom Novel Integrated Deacidification (NID) Systems, associated inlet and outlet ductwork, and four (4) Howden booster fans. API is installing nearly 225,000 SF of Type I prefabricated panels on the ductwork sidewalls and a conventional roof deck on the duct tops.