Project Location: Oak Creek, WI Office
Owner: WE Energies
Contractor: Bechtel Power
WE Energies built two new side-by-side 600-MW coal-fired power plants on the shores of Lake Michigan, and APi was the chosen contractor to install all insulation, lagging, and pipe jacketing for these new plants. The total sum of the boiler piping, AQCS piping, and balance of plant exceeded 23 miles when APi finished with the project. In addition to all the piping, APi also insulated nearly 950,000 SF of flatwork including the two 600-MW coal-fired boilers, SCR's, baghouses, and ductwork.